Commissioning of turbines PT-12

Status: Completed
Object: CPP, Source 2
Location: Chișinău, Moldova
Publication date:
15.12.2023
Supply, installation and commissioning of PT-12 turbines with a capacity of 12 MW each at Cogeneration Plant in Chisinau and in Balti, produced by Power Machines at the KTZ plant, worth $ 3 million.
The object of the test is the equipment of the manufacturer of OJSC “Kaluga Turbine Plant”:
- Turbine PT-12-35 / 10M, manufactured in 1994;
- Auxiliary equipment for the turbine unit.
The objectives of the survey:
- Verification of the operational characteristics of the turbine unit to the requirements of the technical regulations and the manufacturer;
- Assessment of the state of the turbine control system and steam distribution organs;
- Assessment of compliance of vibration characteristics with technical regulations requirements;
- Identification of defects in the operation of the turbine and auxiliary equipment.
Stages of the survey:
- Acquaintance with the operational and repair documentation for the turbine, identification of comments by service personnel, failures and malfunctions that occurred during operation and ways to eliminate them.
- Assessment of the general condition of the turbine units and operational parameters, comparing them with the values established by the technical conditions for the supply.
- Check on a working turbine unit:
- The vibrational state of the turbine;
- The elements of regulation and protection with the removal of the characteristics of regulation at idle and under load;
- Verification of the operation of components and equipment of the turbine unit.