Design and replacement of pumping stations
Status: Completed
Object: CPP, Source 2
Location: Chișinău, Moldova
Publication date:
15.12.2023
Design and replacement of 8 pumping stations (C-1250) at Cogeneration Plant in Chisinau, with a total value of $ 3.4 million.
Horus Energy Company replaced condensate pumps with increased productivity at horizontal network heater. The goal was to upgrade the steam turbine PT-80 / 10-130 / 13. Integration with existing equipment was carried out, the foundation was designed for new pumps, and mode adjustment was carried out.
The Ukraine company Nasosenergomash was chosen as the equipment supplier.
Other projects