Supply and replacement of water economizer and steam superheaters
Status: Completed
Object: CPP, Source 2
Location: Chișinău, Moldova
Publication date:
15.12.2023
Supply and replacement of a water economizer, as well as the first and second stages of a superheater of GM-50 boilers at CHPP-1 Chisinau.
Purpose of work:
The restoration of technical and economic characteristics to values close to the design with the replacement and (or) restoration of any components.
Overhaul of the medium-pressure boiler unit GM-50 No. 3.
Name of works:
- Replacement of superheaters of the first and second stages and steam chamber;
- Incoming inspection of pipes for the manufacture of superheaters;
- Metal control during repair and replacement of superheaters.
Scope of work:
- Assembly and disassembly:
- Packets of coils of the stage No. 1 assembly;
- Packets of coils of the stage No. 2 assembly;
- Steam chamber;
- Drum repair (preparation of holes for connecting pipes);
- Collector repair (preparation of holes for connecting pipes);
- Removal and restoration of the outer skin;
- Removal and restoration of lining;
- Ultrasonic metal control and radiography of all butt welded joints in the manufacture of heating surfaces and collectors of the GM-50 boiler;
- Ultrasonic metal control when replacing heating surfaces and collectors of the GM-50 boiler;
- Magnetic powder flaw detection of all angular welded joints during installation of heating surfaces on the collectors of the GM-50 boiler.
Overhaul of the medium-pressure boiler unit GM-50 No. 4.
Name of works:
- Replacement of the water economizer of the first stage;
- Installation of a condensation unit and piping;
- Incoming inspection of pipes;
- Metal control.
Scope of work:
- Montage demontage:
- Water economizer;
- Coils;
- Removal and restoration of the outer skin;
- Removal and restoration of lining;
- Installation of a condensation unit;
- Ultrasonic metal control and radiography of all butt welded joints in the manufacture of heating surfaces and collectors of the GM-50 boiler;
- Ultrasonic metal control by replacing heating surfaces and collectors of the GM-50 boiler;
- Magnetic powder flaw detection of all angular welded joints during installation of heating surfaces on the collectors of the GM-50 boiler.
Other projects